|

BAE System's
United Defense, as a member of the integrated design team for the
manned ground vehicle portion of the FCS program is developing the
Non-Line-of-Sight-Cannon, and the Non-Line-of-Sight-Mortar
designs.
The mortar system and
mortar platoon are designed to be highly flexible and agile in
establishing sensor-shooter linkages supporting 24/7 availability
of support fire, in all weather and terrain conditions at extended
ranges. The Non-Line-of-Sight Mortar (NLOS-M) will provide fires
in close support of tactical maneuvers that include destructive
fires and special purpose fires. The system will be capable of
firing Precision Guided Mortar Munitions,
to destroy high payoff and most dangerous targets, and provide
area suppression in support of Modular Force companies and
platoons. The system will employ improved handling, loading and
firing systems to accelerate the rate of fire. The mortar platoon
will retain a dismounted 81mm mortar capability for complex
terrain.
The system will
support the Modular Force Combined Arms Battalions (CABs) maneuver
units. The platoon will be capable of responding to fire requests
on-demand to engage complex and simultaneous target sets. The
systems will employ a network centric communications system to
share intelligence and targeting information and fire control
procedures to enable each system to pursue semi- to fully
autonomous computation of technical fire direction, automatic gun
lay, preparation of the ammunition for firing and mortar round
firing.
Much of the advanced
technology being developed for the NLOS Cannon is being
incorporated into the design and development of other vehicles in
the MGV family, such as the NLOS Mortar. The NLOS Mortar is being
designed by BAE Systems to have an estimated 80 percent
commonality with the NLOS Cannon chassis and mission equipment to
reduce maintenance and logistics. A NLOS Mortar Firing Platform is
expected to be delivered for testing and qualification in spring
2007. The Army plans for FCS first unit equipped in 2008 and
initial operational capability in 2010.
|